You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Group Vice President, Europe and Africa
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Group Vice President, Middle East
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
Specialised solutions to improve supply chain efficiency
Safe, reliable and swift delivery of quality marine fuels at competitive prices
Round-the-clock ship supply services
Specialised solutions to improve supply chain efficiency
Safe, reliable and swift delivery of quality marine fuels at competitive prices
Round-the-clock ship supply services
Specialised solutions to improve supply chain efficiency
22 Nov 2023 / Singapore
Work to install a cofferdam is being conducted until 28 February 2024.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.109 of 2023, the work is being carried out between 0800 and 2000 hours daily - including Sundays and Public Holidays - off West Jurong Channel, within the working area bounded by the following co-ordinates (WGS 84 Datum):
1 1° 17.997'N 103° 49.456'E
2 1° 17.983'N 103° 49.456'E
3 1° 17.983'N 103° 49.418'E
4 1° 17.996'N 103° 41.481'E
The works involve removal of rocks, excavation, installation of concrete cofferdam, backfilling, and reinstatement by long armed excavators.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control on Channel 22 for assistance, if required.
For information about operations in Singapore, contact GAC Singapore at singapore@gac.com