You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
22 Jul 2024 / Hong Kong
Withdrawal of three yellow marker buoys and establishment of an east cardinal mark buoy will take place at Stanley Bay with effect from 1 August 2024.
The three yellow marker buoys “ST1”, “ST2” and “ST3” at the following positions (WGS 84 Datum) will be withdrawn:
(A) 22° 12.986’N / 114° 12.588’E
(B) 22° 12.988’N / 114° 12.609’E
(C) 22° 13.003’N / 114° 12.610’E
The east cardinal mark buoy “ST-E” with details as follows will be established:
Name: ST-E
Position (D) (WGS 84 Datum): 22° 12.995’N / 114° 12.610’E
Type: East cardinal mark
Shape: Pillar
Colour: Black with a single broad horizontal yellow band
Light Characteristics: Q(3) 10s
Colour of Light: White
Top mark: Two black cones, one above the other, base to base
Radar Reflector: Build-in
Material: Polyethylene
(For information about operations in Hong Kong, contact GAC Hong Kong at [email protected])
Source: Government of the Hong Kong SAR Marine Department Notice No.129/2024