11 Mar 2022 / Hong Kong

Temporary loading facility at Penny’s Bay

A temporary loading facility has been established at Penny’s Bay. The temporary loading facility will operate for a period of approximately three months.

Two dumb lighters and one tugboat will berth at the facility within the operation area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline for loading operation:
(A) 22° 18.608’N 114° 03.239’E
(B) 22° 18.560’N 114° 03.266’E
(C) 22° 18.441’N 114° 03.017’E
(D) 22° 18.489’N 114° 02.991’E

The hours of operation will be round-the-clock.

(For information about operations in Hong Kong, contact GAC Hong Kong at [email protected])

Source: Government of the Hong Kong SAR Marine Department Notice No.50 of 2022

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon