You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
23 Mar 2022 / Novorossiysk, Russia
Service at the Novorossiysk CPC SPM-2 has been suspended after underwater survey conducted yesterday (22 March) found damage to the inner sleeve of its floating hose. This damage does not allow safe loading operations.
It is estimated that it will take about three weeks to replace the hoses, but this depends on weather conditions, which are unfavourable in the coming days.
This follows the temporary decommissioning of SPM-3 for hose replacement and flushing. The terminal is waiting for tanker nomination for flushing of new hose mounted.
As SPM-1 is currently the only workable SPM at CPC, the terminal management has been forced to report a possible reduction in the volume of crude oil transportation in the near future.
For information about shipping operations in Russia, contact GAC Russia at [email protected]