You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
27 Aug 2020 / Port Kembla, Australia
Port Kembla Coal Terminal (PKCT) has advised revised air draft and operational guidelines for loading sequence at Coal Berth 102:-
Air draft - 20.40m
Loading sequence - maximum allowable Hatch passes is one full hatch pour (single pour) followed by two pours per remaining hatches in addition to two final trim passes. Trim passes will not load less than 150 tonnes per hold.
For information about operations in Australia, contact GAC Australia at [email protected]