You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
05 May 2021 / Tuticorin, India
Vessels proposed to be berthed at B-9, with maximum draft of 14.2 metres, must arrive even keel.
The vessel must correct the list and trim, if any, prior to docking to make the vessel even keel as it causes increase in draft which may exceed 14.2 metres.
The vessel must check the draft visually and report the arrival observed draft, while requesting for pilot. The vessel must report all six-side observed arrival draft.
The vessel with maximum draft of 14.2 metres shall be handled with the minimum tide of 0.65 metres, during flooding tide.
Pilots shall visually verify the declared port prior boarding the vessel.
(For information about operations in India, contact GAC India at [email protected])
Source: V.O. Chidambaranar Port Trust Marine Trust Harbour Notice-01 dated 5 May 2021