You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
06 Oct 2022 / Panama Canal, Panama
Effective October 1, 2023, all vessels with a beam of 109 feet or more transiting the Panama Canal will be required to have a fixed (non-portable) piloting unit with Real Time Kinematics (RTK) for submeter accuracy. This measure is expected to improve the efficiency of the waterway by eliminating the delays associated with the installation of portable piloting units (PPU-RTK).
The vessel will be responsible to procure, install, configure, and maintain the fixed piloting unit in proper condition. The unit shall be installed and powered to provide the required communication with the pilot´s tablet and the SafePilot’s software via wireless network, ensuring a stable and long-range connection in all conning positions during the transit through the Panama Canal.
The specifications and installation guide for the fixed piloting unit are available through the following link: https://pancanal.com/en/maritime-services/non-portable-piloting-unit/
Once this new requirement is effective, the compliance of the piloting unit will become part of the vessel´s arrival inspection. If requirements are not met, a portable piloting unit with Real Time Kinematics (PPU-RTK) will be temporarily installed in the vessel, at an additional cost.
The above-mentioned requirement is mandatory. Non-compliance may result in delay of transit and/or additional costs, as well as possible fines.
For information about operations in the Panama Canal, Panama, contact GAC Panama at [email protected]