You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
29 Dec 2020 / Singapore
With effect from 28 Dec 2020 to 31 Mar 2021, the installation of mooring dolphins will be carried out at Marina Bay Cruise Centre, within the working area bounded by the following coordinates:
According to the Maritime and Port Authority of Singapore Port Marine Notice No.099 of 2020, works will be conducted 24 hours daily, including Sundays and public holidays.
Crafts involved in the works will exhibit the appropriate local and international day and night signals. The installation works will be carried out by the piling and crane barge whilst the materials will be transported to the working area by tug and barge. A safety boat will be deployed in the vicinity to warn other craft about the works.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 12 (East Control); and
e) Communicate with East Control for assistance, if required.
For information about operations in Singapore, contact GAC Singapore at [email protected]