You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
11 Mar 2021 / Novorossiysk, Russia
The following draft limitations are in force at Sheskharis Oil Terminal berths:
Berth 1A
19.4 m
Berth 1
23.4 m
Berth 2
13.9 m
Berth 3
10.5 m
Berth 4 (auxiliary berth)
3.7 m
Berth 5
9.0 m
Berth 6
12.9 m (to take into consideration 11.4 m depth at 60 m off the jetty)
Berth 7
12.9 m
Berth 8
8.9 m (berth section #1 with L=120 m from berth No.7)
8.8 m (berth section #2 with L=20 m from section #1)
The minimum under keel safety clearance is 0.6 m, and the maximum permitted draft on approaches is 19.0 m.
For further details and updates, as well as information about operations in Russian ports, contact GAC Russia at [email protected]